Current & Potential Transformers

.3 / 6.6 / 11kv Grade CT ...

kaydee co.    [Electrical Equipment & Supplies]   [Transformers]

Accuchek+1 testing transformer

Accuchek+ is specially designed for on site testing of three phase whole current and current transformer operated energy meters. It helps to reduce meter testing cycle time and improve revenue protection with reliable and accurate error measurements. Accuchek+ is a very robust ...

Secure meters ltd.    [Electrical Equipment & Supplies]   [Transformers]

Industrial Transformers

We are engaged in the manufacture of quality transformers and allied products benchmarked against the best available in the international markets. We have the capability and expertise to manufacture customized products, as per the specifications of our clientele. Our product ...

DELTA POWER SYSTEMS    [Electrical Equipment & Supplies]   [Transformers]

TRANSFORMER

TRANSFORMER ...

Kinword Ind. Co.,Ltd    [Electrical Equipment & Supplies]   [Transformers]

On Load Tap Changer

Manufacturers Of Quality Spares For Transformers And On Load Tap Changer ( Oltc ) Off Load Tap Changer For Distribution Transformers Tapping Switch & Remote Tap Control Cubicle ( Rtcc ). Transformer Coil Winding Machine. Manufacturing Transformer Spares Ranging From Up To 150 ...

S. F. ENGiNEERiNG WORKS    [Electrical Equipment & Supplies]   [Transformers]

DISTRIBUTION TRANSFORMERS

Conventional Type, three phase, 50Hz supply frequency, copper winding, double wound, "A" class insulation, self-cooled, oil immersed, ONAN (cooling), indoor/outdoor type, designed to ensure better coolling, low noise level, better impulse and short circuit withstand ...

sify    [Electrical Equipment & Supplies]   [Transformers]

transformers

transformers RF/IF surface mount ...

M-RF Co., Ltd.,    [Electrical Equipment & Supplies]   [Transformers]

Auto Transformer

The Auto transformer are frequently used to covert local power to some other voltage, like 3 phase 440 to 230v and 1 phase 230v to 115v. ...

Espee Electricals    [Electrical Equipment & Supplies]   [Transformers]

L.T. Tape insulated/ Resin Cast Potential Transformer

...

Gyro Laboratories Pvt. Ltd.    [Electrical Equipment & Supplies]   [Transformers]

Potential Transformer (FURNACE POWER COMPONENT )

...

Electro Power Engineers    [Electrical Equipment & Supplies]   [Transformers]

Transformer

Capacity(kVA) No-load Current(%) Voltage Regulation(%) No-load Losses(W) Efficiency(%) Dimensions(mm) Total Weight(kg) W D H 10 1.2 2.0 12 97.9 480 550 1,020 125 20 1.2 1.7 19 98.2 530 600 1,060 180 30 1.0 1.5 25 98.4 560 630 1,110 235 50 0.8 1.4 35 98.6 630 710 1,150 340 75 ...

cherrypicks    [Electrical Equipment & Supplies]   [Transformers]

Recifier power transformer

...

Signal Transformer    [Electrical Equipment & Supplies]   [Transformers]

100KVA, 3Ph, Isolation Transformer

...

Arya Transformers Pvt. Ltd.    [Electrical Equipment & Supplies]   [Transformers]

Electrical Distribution Transformers

...

Sai Electricals    [Electrical Equipment & Supplies]   [Transformers]

Special type Tailor made Transformers

...

TESLA TRANSFORMERS & ELECTRiCALS    [Electrical Equipment & Supplies]   [Transformers]

Distribution Transformers

...

Grand Spektra    [Electrical Equipment & Supplies]   [Transformers]

Inverter Transformers EFL-10701

Model Number:EFL-10701 6.5 Watts CCFL Driving Inverter transformers. ...

Elytone Electronic Co., Ltd    [Electrical Equipment & Supplies]   [Transformers]

Power transformer

EI-28,35,41,48 0.1~14 1~4 With end bell/without end bell "Optional" EI-54,57,60,66,76,86,114 5~200 1~4 1.With end bell 2.With thermal fuse * Ballast * Ballast : To use with fluorescent lamp 4-6-8-15-20W * Line Matching Transformers * Power Core Size & Line Voltage Pri. Rated ...

Hon-Kwang Electric Co.,Ltd.    [Electrical Equipment & Supplies]   [Transformers]

SR-CT Current Transformers

To be used with EOCR over-current relays for motor current larger than EOCR basic current ratings IEC Inverse Trip Characteristic compliance Protection Class ...

Advanced Power Equipment (M) Sdn Bhd    [Electrical Equipment & Supplies]   [Transformers]

Stratos Mono Block Transformers

Units undergo a three-level QC process that includes: (1) Careful testing of all components and assembled boards; (2) Testing of units immediately following assembly, (3) A strict 48 - 72 hour burn-in process. Final steps include a double-check of bias and offset, oscilloscope ...

A. R. N. Systems    [Electrical Equipment & Supplies]   [Transformers]