Supply Ability 200000 Piece/Pieces per Month Model Number AZ63HP, AZ63,AZ31, Brand Name YILDIRIM DOKUM Secondary Or Not Is Secondary Place of Origin Turkey Model Number AZ63HP, AZ63,AZ31, Brand Name YILDIRIM DOKUM Secondary Or Not Is Secondary Place of Origin Turkey Magnesium Ano
Stainless Steel Pipe & Tube Stainless Steel Pipe & Tube Type STS304(L), STS316(L), ETC Size Thickness 0.4mm ~ 50mm(Extra consultation needed over 60mm) Out Diameter ~ 1000 mm (Extra consultation needed over these sizes) Length 1000 ~ 12000 mm (Extra consultation needed over th
Standard BS Standard BS PIPES & TUBES C S. Seamless Pipes 1/4" NB to 16" NB SCH 5, SCH 10, SCH 20, SCH 40, SCH 80, SCH 160, SCH XXS. ASTM A-106, ASTM A 53 ASTM A 210 A, B & C, A & B A-1 BS 3059 Part I, II, SA 179 With IBR TC & Non IBR etc.
Supply Ability 20000mt/month Minimum Order Quantity 5mt/size Payment Terms L/C,T/T Model Number line pipe Model Number line pipe 1, wall thickness range 1------60mm (1 / 25"---2 2 / 5") 2, outer diameter range 10-----630mm (2 1, wall thickness range 1------60mm (1 / 25"---2 2 / 5
Section Shape Square Alloy Or Not Is Alloy Section Shape Square Alloy Or Not Is Alloy ALLOY STEEL Tubes Bar IBR Approved - Specialize Manufacturer Test Certificate / IBR Test Certificate / Laboratory Test Certificate from Govt. Approved Lab. & Under Third Party Inspection with E
Standard UL Welded Line Type Longitudinal Technique SAW Certification UL Standard UL Welded Line Type Longitudinal Technique SAW Certification UL Aurohill supplies Large diameter steel pipes for oil and gas pipelines, conforming to API 5L, EN, and GOST standards. Aurohill supplie
HDPE pipe after jointed should be tested. HDPE pipeline need hydrostatic test to prooved no leakage on pipeline HDPE pipe after jointed should be tested. HDPE pipeline need hydrostatic test to prooved no leakage on pipeline. The pressure is depend on HDPE pipe pressure number (PN
Delivery Time Within 4 to 6 weeks Package Sea worthy Standard packing Supply Ability 200 Metric Ton per Day Minimum Order Quantity 100 Metric Ton Payment Terms L/C Port Shangai Fob Price US$800-1000Shangai Model Number Not applicable Technique Seamless Technique Hot Rolled Place
Seamless Stainless Steel DIN 17458 Other materials available for GB, ANSI, EN, BS, and ISO designations
Secondary Or Not Is Secondary Secondary Or Not Is Secondary Black pipe is manufactured at our Kolkata plant, and Plot No.03, Chandigarh plant. Black pipe is used for transportation of air, gas, fabrication of structure, automobiles, cycles and general furniture industries. Varnis
Delivery Time AFTER CONFIRMATION DEPENDS ON ORDER NORMALY ONE WEEK Package STANDERED METAL WRAP PACKING Supply Ability 50000 Metric Ton per Year Minimum Order Quantity 100 Metric Ton Payment Terms L/C,T/T,Western Union Port ANY PORT U AE Fob Price US$620ANY PORT U AE Technique ER
Surface Treatment Galvanized Surface Treatment Galvanized Standard ASTM A53 GR B, A106 GR B API 5LX GRB API 5LX Schedule 20, 30, 40, 60, 80, 120, 160, XXH & STD. Standard ASTM A53 GR B, A106 GR B API 5LX GRB API 5LX Schedule 20, 30, 40, 60, 80, 120, 160, XXH & STD. Finish Bl
Welding Line Type ERW Technique ERW Section Shape Square Welding Line Type ERW Technique ERW Section Shape Square COLD FORMED STRUCTURAL HOLLOW SECTIONS Circular hollow sections 26.9mm x 3.0mm - 190.5mm x 6.3mm Square hollow sections 30mm x 30mm x 2.0mm - 150mm x 150mm x 6.3mm Re
Minimum Order Quantity 150 Piece/Pieces Payment Terms L/C Port Durban Fob Price US$125Durban Length 6 Grade 300WA Technique Welded Place of Origin South Africa Thickness 6 Outer Diameter 177.8 Length 6 Grade 300WA Technique Welded Place of Origin South Africa Thickness 6 Outer Di
Model Number 001 Secondary Or Not Is Secondary Place of Origin Liaoning China (Mainland) Model Number 001 Secondary Or Not Is Secondary Place of Origin Liaoning China (Mainland) Steel Tube widely used in automobile industry,petrochemical industry and refrigerating equipment proce
Certification BSI Secondary Or Not Is Secondary Alloy Or Not Is Alloy Certification BSI Secondary Or Not Is Secondary Alloy Or Not Is Alloy Syphon Tubes We supply wide range of siphon tubes that protects instruments from high temperature and direct contact Oring ptfe packing any
Delivery Time 2WWEEKS Package WE NEED SEAMLESS PIPE 20X2 40 TON 40X4 40 TON Supply Ability 100 Ton per Year Minimum Order Quantity 20 Ton Payment Terms L/C,T/T Technique Seamless Place of Origin China (Mainland) Technique Seamless Place of Origin China (Mainland) WE NEED SEAMLESS