Searching 3' , total 632720 products,queries done in 336 ms

Spiral welded steel pipe

Delivery Time within 30 days Package in bulk Supply Ability 10000 Ton per Month Minimum Order Quantity 10 Ton Payment Terms L/C,T/T Port xinggang Fob Price US$600-700xinggang Secondary Or Not Non-secondary Alloy Or Not Non-alloy Application Structure Pipe Place of Origin Hunan Ch

Hunan Great Steel Pipe Co., Ltd.   

steel pipe

Delivery Time 30 days Package export packing Supply Ability 100000 Metric Ton per Year Minimum Order Quantity 20 Metric Ton Payment Terms L/C,D/P,T/T Port Xingang Fob Price US$500Xingang Grade Q235 Q345 S275 S355 Specification 89-406MM Model Number ERW Brand Name xinling Techniqu

Tianjin Silence Environmental Engineering Co., Ltd.   

line pipe

Payment Terms L/C,T/T Technique Seamless Place of Origin China (Mainland) Technique Seamless Place of Origin China (Mainland) seamless steel pipes API 5L (6) packing international stardard packing (5) other specification availbale according to customers' requirement (4) thickness

Changzhou Longjiang Metal Materials Co., Ltd.   

special thin tube

Delivery Time about one month Package according to buyer request Supply Ability 50,000,000 Kilogram per Year Minimum Order Quantity 5 Ton Payment Terms L/C,T/T Port shanghai Fob Price US$800-3000shanghai Section Shape Rectangular Secondary Or Not Non-secondary Application Structu

Wuxi City Fuyang Precision Pipe Making Co., Ltd.   

Galvanized Pipe

Delivery Time 45days Package standard export package and caps Supply Ability 800 Ton per Month Minimum Order Quantity 10 Ton Payment Terms L/C,T/T Port tianjin xingang Fob Price US$600-800tianjin xingang Secondary Or Not Non-secondary Alloy Or Not Non-alloy Application Structure

Hebei Baohang Machinery And Electrical Equipment Co., Ltd.   

Galvanized steel pipe Q195,Q215,Q235,Q345,STK500

Delivery Time within 25 days Package international standard packaging or according to customers requirement Supply Ability 400 Ton per Day Minimum Order Quantity 10 Ton Payment Terms L/C,T/T Port xingang tianjin Fob Price US$750-1250xingang tianjin Secondary Or Not Non-secondary

Tianjin Sino-Stone Alloy and High-Pressure Pipe Co., Ltd.   

Galvanized Steel Pipe

Delivery Time within 45 days Package International standard packing Supply Ability 500 Metric Ton per Week N/A Minimum Order Quantity 20 Metric Ton N/A Payment Terms L/C,T/T Port Tianjin Fob Price US$650-1400Tianjin Secondary Or Not Non-secondary Alloy Or Not Is Alloy Application

Beijing Xinyinghengtong Metal Products Co., Ltd.   

WELDED TUBE

Package IN BUNDLE Minimum Order Quantity 20 Ton Payment Terms L/C,T/T Section Shape Round Secondary Or Not Non-secondary Alloy Or Not Non-alloy Application Fluid Pipe Place of Origin Tianjin China (Mainland) Outer Diameter DN15-DN114 Grade A179B, A53B, Q195, Q215, Q235, Q345, 20G

Tianjin Shun Taida Imp & Exp Co., Ltd.   

ASTM A106,ASME SA106,API 5L/ASTM A106/53 high temperature seamless carbon steel pipe

Delivery Time within 30 days Payment Terms L/C,T/T,Western Union,MoneyGram Technique Seamless Technique Hot Rolled Surface Treatment Other Place of Origin Jiangsu China (Mainland) Grade A179B, API J55, API K55, API L80, API N80, API P110, A106B, ST37, ST52, STK400 Standard BS, JI

Shanghai Yichen Industrial Co., Ltd.   

steel tubing,steel pipe,pipe

Delivery Time 35 DAYS Package BUNDLES AND WOODEN BOX Supply Ability 15000 Ton per Year Minimum Order Quantity 1 Ton Payment Terms L/C,D/P,T/T,CAD Port NINGBO OR SHANGHAI Steel Grade 300 Series Type Seamless Brand Name PYE Grade 300 Series Dimensions OD 6mm-830mm WT 0.9mm-60mm Sta

Zhejiang Pengye Stainless Steel Tube Industrial Co., Ltd.   

ASTM A53-B seamless steel pipe

Delivery Time One month or two months, decide according to goods how many. Package (1)Plastic hats cover two ends tied in bundles by steel strips and paint on the pipe.(2)Paint Varnish Coating, Plastic Caps and mark on the pipe(3)Bundle packing Supply Ability 400 Metric Ton per D

Shandong Liaocheng Luxi Metal Materials Co., Ltd.   

ERW steel pipe

Delivery Time 30-60days Package in bundles Supply Ability 10000 Ton per Year Minimum Order Quantity 15 Ton Payment Terms L/C,T/T Port Tianjin Fob Price US$610-780Tianjin Secondary Or Not Non-secondary Alloy Or Not Non-alloy Application Fluid Pipe Place of Origin Hebei China (Main

Hebei Liqun Pipeline Trading Co., Ltd.   

High Pressure Oil Tubes for Diesel Engine

Delivery Time 30-60 days Package internal wrapped with plastic foil,external wrapped withP E.packed in seaworthy wooden cases Supply Ability 100 Ton per Month Minimum Order Quantity 2 Ton Payment Terms L/C,T/T Port Shanghai Fob Price EUR1000-3000Shanghai Usage oil tubes for diese

Zhangjiagang Huadian Import & Export Co., Ltd.   

ASTM A 53 GR.B steel pipe

Delivery Time with in 20 days Package export standard packing Supply Ability 500 Ton per Month Minimum Order Quantity 5 Ton 1x20' container Payment Terms T/T Port Tianjin Secondary Or Not Non-secondary Alloy Or Not Non-alloy Application Gas Pipe Place of Origin Tianjin China (Mai

Shanghai Hanqi Metallic Material Co., Ltd.   

Casing and Tubing (API 5CT J55/K55/N80/L80/P110)

Delivery Time within 35 days Package steel package and sea worthy Supply Ability 40000 Metric Ton per Month or more Minimum Order Quantity 6 Ton or as client's requirement Payment Terms L/C,T/T Port Qingdao or Tianjin Fob Price US$700-900Qingdao or Tianjin Secondary Or Not Non-se

Qingdao Noble International Co., Ltd.   

Hot-dipped Galvanised Steel Pipes

Delivery Time 10-30days Package Nacked packing Supply Ability 20000 Ton per Month Minimum Order Quantity 20 Ton Payment Terms L/C,T/T Port shanghai ,tianjin Fob Price US$780-1050shanghai ,tianjin Brand Name CENTRUE Technique Seamless Grade Q195-Q235 Model Number HDG-RON Brand Nam

SHANGHAI CENTRUE TRADING CO., LTD.   

Pipe

Package .Packing As per export standardor as customer required. Payment Terms L/C,T/T Port Tianjin port of China Technique Seamless Place of Origin China (Mainland) Standard GB Technique Seamless Place of Origin China (Mainland) Standard GB pipe size 10#,20#,35#,45#,20G ,16Mn ,27

Tianjin Chinaland International Trading Co., Ltd.   

Welded Tube

Delivery Time within 15-20 days after deposite or negotiation Package 1.small size pipes can be packed by steel strips into bundles.2.large size pipes can be packed in bulk.3.woven cloth4.according to the requirement of customers. Minimum Order Quantity 10 Ton Payment Terms L/C,T

Tianjin Jie Feng Steel Pipe Industry and Trading Co., Ltd.   

JIS G3454,STPG370,STPG410,Boiler tubes,Ms.TuTu

Delivery Time 30-60days Package Package bare packing/bundle packing/crate packing/wooden protection at the both sides of tubes Supply Ability 4500 Metric Ton per Month Minimum Order Quantity 5 Metric Ton Payment Terms L/C,T/T Port Shanghai Type Seamless Technique Cold Drawn Surfa

Suzhou Seamless Steel Tube Works   

EMT pipe 3/4"

Delivery Time 15 to 35 days,according to per PO. Package Small package,20pcs/bundle,tied with wires Master package,20pcs/small bundle,tied with wires,then 50small bundles/master,tied with steel straps Each bundle covered with woven bag. Supply Ability 800 Ton per Month 5 Ton per

Zhangjiagang Yihuatong Metal Material Co., Ltd.