GDKC-2000 Transformer On Load Tap Changer Tester

Packaging
N/A
Delivery
15 Days

GDKC-2000 Transformer On Load Tap Changer Tester
General introduction:
  • The tester can record switch operation waveform in overall process.
  • The longest time is 6.4s.
  • It can test various parameters such as transition waveform, transition time, transition resistance and three phase synchronization one time and analyze results automatically.
  • It has power-off protection, over-voltage protection, perpetual clock and high-speed printing.
Technique index:
1. Three way independent test power, the maximum output current is 0.5A.
2. Processing part: 80C320 high speed 8 digit microprocessor High speed A/D converter, the 3.Maximum sampling rate can reach 400KHz
4. Tester set sampling rate:10~20KHz
5. Maximum save time of single waveform:6.4s
6.Transition resistance measuring scope:0~40Ω
7.Measuring precision:<10%
8.Power supply: 220V±10% power:200W
9. Size: 410mm´320mm´260mm
10. Weight: 20kg
  • Country: China (Mainland)
  • Business Type:
  • Market:Africa,Americas,Middle East,Oceania,Asia
  • Founded Year:2009
  • Address:NanPing
  • Contact:Rita Lee
*Your name:
*Your Email:
*To:ChongQing Gold Machine& Electric Equipment Co., Ltd.
*Subject:
*Message:
Enter between 20 to 3,000 characters. English only.     Characters : 0 / 3000
*Enter the secure code shown below Mfrbee security Image      Reload Image

submiting now We do inquire for you , please wait ...

Transformer OLTC On Load Tap Changer Analyzer
Transformer OLTC On Load Tap Changer Analyzer

Transformer OLTC On-load Voltage Adjustment Switch Characteristics Tester On Load Tap Changer Analyzer INTRODUCTION: It can test various parameters such as transition waveform, transition time, transition resistance and three phase synchronization one time and analyze results ...

GOLD

GDKC-2000 Transformer Load Voltage Adjustment Switch Tester
GDKC-2000 Transformer Load Voltage Adjustment Switch Tester

GDKC-2000 Transformer Load Voltage Adjustment Switch Tester INTRODUCTION: It can test various parameters such as transition waveform, transition time, transition resistance and three phase synchronization one time and analyze results automatically. PAMAMETERS: GDKC-2000 ...

GOLD

GDKC-2000 Transformer Load Voltage Adjustment Switch Tester
GDKC-2000 Transformer Load Voltage Adjustment Switch Tester

1.1 General introduction The tester can record switch operation waveform in overall process. The longest time is 6.4s.It can test various parameters such as transition waveform, transition time, transition resistance and three phase synchronization one time and analyze results ...

重庆格纳迪机电设备有限公司