Four heads beer bottle filling machine

Product Quick Detail

FOB Price
USD $2,800.00 / Piece
Minimum Order
1
Place Of Origin
Jinan
Packaging
N/A
Delivery
15 Days

1.Firstly install the beer filler on the filling site. It is better to be closer to the draft beer buffer tank.

2.Adjust the four footing screws of the filler until it does not shake and be steady.

3.Connect beer inlet pipe. The filler beer inlet pipe mouth is DN20 flexible pipe connector, the same as buffer tank beer outlet pipe mouth. This two pipe mouth can be connected by pressure hose (the internal diameter of the flexible pipe is 2.5cm). After insert the flexible pipe, tighten it by steel wire clamp.

4.Connect CO2 inlet pipe, that is: connect the filler air inlet and beer buffer tank CO2 flushing pipe mouth(beer buffer tank CO2 flushing pipe can connect three links ) by∮8PU pipe. Inset the pipe directly, which can make sure the beer pressure is the same as CO2 pressure.

  • Country: China (Mainland)
  • Business Type: Beer filling machine and brewery equipment
  • Market:Europe
  • Founded Year:2006
  • Address:
  • Contact:Niki Zhang
*Your name:
*Your Email:
*To:Shandong HG Machinery co., Ltd
*Subject:
*Message:
Enter between 20 to 3,000 characters. English only.     Characters : 0 / 3000
*Enter the secure code shown below Mfrbee security Image      Reload Image

submiting now We do inquire for you , please wait ...