Application: The reinforcement of rock mass can improve the force of retaining piles, and can change the internal force distribution of the components.
Characteristic: construction preparation - the anchor hole drilled - anchor cable installation - anchor hole grouting - waist beam (anchor beam, anchor pier or cross beam, steel
stents)construction - waist beam and pile is filled with the concrete dense - anchor hole tension lock - acceptance of the anchor.
Tel:+86-182 3676 6038
Fax:+86-0371-6053 5957
E-mail:zxsteel@zxsteelgroup.com