First of all, during the pressure test, the sealing device of pipe hydrostatic testing machine right through the end of the test tube is sealed at both ends. This is a key point we should focus on. And low pressure water injection, through the exhaust valve and air in the pipe, should filled with water with low pressure. With increasing pressure device to inject high pressure water pipe pressurized until the required test pressure, we will stop the test and check out the result.
At the same time, checking is also a necessary step. if the pipe is no leakage in the pressure test, deformation phenomena, proceed relief. Then open ends of the sealing device, the discharge pressure water pipe will be tested to the examination table visually inspected for suspicious penetration.
灵活轻便的 4 米标准长度 ABS 精益管,适用于精益管道系统 我们是精益管生产厂家,产品工厂直销,价格低,出货量大,是经销商的最佳选择。精益管是由特种复合钢管和表面塑料组成,外层一般为PE ...
适用于 Karakuri 系统的直径 43 毫米标准尺寸 1.7 毫米厚度阳极氧化铝合金管。 我们是铝管生产厂家,产品工厂直销,价格低,出货量大,是经销商的最佳选择。 ...
A self-operated control valve, also known as a self operated pressure control valve or self operated temperature control valve, is an auto control valve that relies on the pressure and temperature of the medium flowing through the valve as an energy source to drive the self ...