FOXBORO P0926GH
inquiry details,pls pay attention as below:
1.All quote based on EXW only
2.Shipping time:5-7 days,via DHL/TNT/UPS/EMS/Fedex..
3.Payment terms: 100% T/T or Western Union PAYMENTS before shipping
(For genuine pic,plds kindly email me ) FOXBORO P0926GH
The chassis power supplies are designed to withstand brief power losses without affecting the operation of the system. The time the system is operational during power loss is called program scan hold-up time after loss of power. The duration of the power supply hold-up time depends on the number, type, and state of the I/O modules, but is typically 20 ms...3 s
Related products:
A03B-0807-K103
A03B-0801-C021
A03B0801C021
AO3B-O8O1-CO21
A03B-0801-C058
A03B-0807-C012
A03B-0807-C001
A03B-0807-C171