It can be used for emergency treatment of wastewater in wastewater treatment stations. When a wastewater treatment station has an emergency, it may take months or longer for the wastewater
treatment station to conduct rectification and debugging. The wastewater produced by the factory cannot enter the wastewater station for treatment, and the factory faces shutdown The huge risk.
At this time, the integrated wastewater treatment equipment can play its emergency role and relieve the urgent needs of manufacturers. The integrated wastewater treatment equipment with fully
automatic facilities can be directly lifted to the site for installation, and transferred to the original sewage tank inlet and outlet pipes. The integrated wastewater treatment equipment will take
over the original sewage tank treatment work. In a short time, the dilemma that the sewage treatment station cannot be operated and the sewage cannot be treated is solved.
The MBR process organically combines the membrane separation technology in the separation project with the traditional wastewater biological treatment technology, and uses the MBR tank to replace
the secondary settling tank, which greatly improves the solid-liquid separation efficiency and increases the concentration of activated sludge in the aeration tank. The specific bacteria
(especially the dominant flora) in the mud increase, which improves the biochemical reaction rate.