Modular HCL HCL Scrubber
Project Name 45000m3/h HCL tail gas scrubber
25000m3/h HCL tail gas scrubber
Location Daman, Saudi Arabia
Time November, 2014
Client Steel wire rope manufacturer
Scope of work EPC
PCC provides EPC service, including process engineering design, pipe match, equipment design
& manufacture, electrical appliance & meter installation, site installation guidance, commissioning
and startup, training etc.
Description The client provided the tail gas component and the local emission requirements. The discharge tail
gas content is much lower than local emission standard This project was delivered within 45 days,
finished installation and commissioning in 5 days.
Evaluation The plant is running stably since started in November, 2014. The client is very satisfied, and develop
long term cooperation with PCC.