Product Quick Detail

Minimum Order
1
Place Of Origin
china
Packaging
N/A
Delivery
15 Days

Mould Component
Mould Components are also a part of the mould. GM-TECH not only produces precision moulds but also provides customers with high-precision, low-cost mould parts. For example mould cores, inserts, sliders, lifter, wear plates, ejector pins, etc. Usually, processing accuracy can be controlled within + /-0.015mm. Delivery time is 2-3 weeks, DHL or FedEx will take about 3 days for shipping.

All the steel and tolerances of the parts are processed according to the drawings of the customers. In order to ensure the quality of parts processing of different types of injection moulding, we will provide customers with dimensional measurement report, hardness measurement report, material proof.

We also use new plastic mold technology to do DLC surface treatment to guarantee the life of the parts.

Mould Component Features
All the steel and tolerances of the parts are processed according to the drawings of the customers. In order to ensure the quality of parts processing, we will provide customers with dimensional measurement report, hardness measurement report, material proof.

We also use new technology to do DLC surface treatment to guarantee the life of the parts.

Mould Components are also a part of the mould. GM-TECH, a reliable injection plastic molded parts manufacturer, not only produces precision moulds but also provides customers with high-precision, low-cost mould parts. For example: mould cores, inserts, sliders, lifter, wear plates, ejector pins, etc. Usually, processing accuracy can be controlled within + /-0.015mm. Delivery time is 2-3 weeks, DHL or FedEx will take about 3 days for shipping.

All the steel and tolerances of the parts are processed according to the drawings of the customers. In order to ensure the quality of parts processing, we will provide customers with dimensional measurement report, hardness measurement report, material proof.

We also use new technology to do DLC surface treatment to guarantee the life of the parts such as medical device molding parts.

Mould Component FAQs
What is the tolerance of parts?What is the tolerance of parts?
If the customer does not have special requirements, the processing is generally within + / - 0.02mm.

How long is the delivery time for mold part processing?How long is the delivery time for mold part processing?
Specific to see the difficulty of part, generally1-2 weeks.

How many days does it take to send parts to Germany?How many days does it take to send parts to Germany?
The fastest DHL express delivery in Europe usually takes about 3 days to reach each country in Europe, while FedEx in the United States usually takes about 3 days to arrive.
  • Country: China (Mainland)
  • Business Type:
  • Market:
  • Founded Year:
  • Address:Shengan Building A, Hengzeng Road Chang'an Town, Dongguan, Guangdong, China
  • Contact:Kevin Shaw
*Your name:
*Your Email:
*To:Glitter Mold Technology Co., Ltd
*Subject:
*Message:
Enter between 20 to 3,000 characters. English only.     Characters : 0 / 3000
*Enter the secure code shown below Mfrbee security Image      Reload Image

submiting now We do inquire for you , please wait ...