Waste-to-energy plant environmental protection incinerator building.
Used for town garbage, plastic mixture recovery, incinerator, garbage disposal.
Wood packing.
Installation length: 6.8 meters.
Equipment width: 3 meters.
Equipment height: 4.5 meters.
Building width: 7 meters.
Building length: 12-15 meters.
Building height: 5 meters.
The weight of equipment is 8 tons.
Spray plastic on the facade.
Daily waste consumption: 1-1.5 tons.
An incinerator that does not produce flame.
No need to add fossil fuels.
Low temperature 30-380 degrees Celsius.
No dioxins and no heavy metals were produced.
Fireprint manufacturing