waste-to-energy plant,Small incinerator structure diagram

FOB Price
USD $55,000.00 / Piece
Place Of Origin
hangzhou
Minimum Order
1
Packaging
Wood packing
Delivery
55-60Days
Waste-to-energy plant environmental protection incinerator building.
Used for town garbage, plastic mixture recovery, incinerator, garbage disposal.
Wood packing.
Installation length: 6.8 meters.
Equipment width: 3 meters.
Equipment height: 4.5 meters.
Building width: 7 meters.
Building length: 12-15 meters.
Building height: 5 meters.
The weight of equipment is 8 tons.
Spray plastic on the facade.
Daily waste consumption: 1-1.5 tons.
An incinerator that does not produce flame.
No need to add fossil fuels.
Low temperature 30-380 degrees Celsius.
No dioxins and no heavy metals were produced.
Fireprint manufacturing
  • Country: China (Mainland)
  • Business Type: Manufacturer
  • Market:Oceania,Middle East
  • Founded Year:2007
  • Address:No. 195-197, Zhenhua Road, Xihu District, Hangzhou City, Zhejiang Province
  • Contact:shengran li
*Your name:
*Your Email:
*To:Hangzhou fireprint Technology Co., Ltd.
*Subject:
*Message:
Enter between 20 to 3,000 characters. English only.     Characters : 0 / 3000
*Enter the secure code shown below Mfrbee security Image      Reload Image

submiting now We do inquire for you , please wait ...