A garbage incinerator without a flamesmokeless incinerator
for homesmokeless incinerator designwaste incinerator
Provide incineration plant design
Solutions for waste disposal at the lowest cost
Low-temperature pyrolysis of waste, design temperature 30-380℃.
Process: evaporation, gasification, carbonization, thermal decomposition, negative ion ash.
Providing waste incinerators and consulting for green waste treatment.
ask.
Shipping to all countries.
Field installation guide.
Delivery time: 50-60 days.
Trademark: Fireprint
environmental management,
Incineration equipment, green incineration, garbage classification