Current Transformer Tester

Place Of Origin
Chongqing of China
Packaging
Wooden Case
Delivery
10 Days

Product model: GDVA-405

Tests for Current Transformer:

1 Excitation curve and parameters test
2 Turns ratio test
3 Ratio and phase error test
4 Polarity mark check
5 Winding resistance measurement
6 Secondary loop burden measurement
7 Error line curve test for protection CT
8 Transient CT parameters test
9 CT nameplate guess
10 Saturation hysteresis loop curve measurement

Tests for Voltage Transformer:

1 Turns ratio test
2 Ratio error and phase angle error test
3 Polarity test
4 Secondary burden test
5 Winding resistance test

Applications of CT/PT Analyzer:

1 CT nameplate check
2 CT parameters check in work burden
3 CT transient parameters analysis
4 CT ratio and phase error calibration
5 PT routine test

CT PT Analyzer Function and Technical Index:

1 Test standards: IEC60044-1, IEC60044-6, IEC60044-2, IEC60044-5, C57.13
2 Power supply: AC220V±10%, 50/60Hz±10%
3 Voltage output: 0.1~180V (AC)
4 Current output: 0.001~5A(RMS)
5 Power output: 500VA
6 Maximum knee voltage measurement: 45KV
7 Current measurement:
Range: 0~10A (automatically change range in 0.1/0.4/2/10A)
Error: <±0.1%+0.01%FS
8 Voltage measurement:
Range: 0~200V (automatically change range in 1V/10V/70V/200V)
Error: < ±0.1%+0.01%FS
9 Turns ratio measurement:
Range:1~35000
1~2000 error<0.05%
2000~5000 error<0.1%
5000~35000 error<0.2%
10 Phase measurement: error: ±2min; resolution: 0.01min
11 Winding resistance measurement:
Range: 0~8kΩ (automatically change range in 2ohm/20ohm/80ohm/800ohm/8kohm)
Error: < 0.2%RDG+0.02%FS
Maximum resolution: 0.1mΩ
12 Temperature measurement:-50~100 Celsius degree; error<3 Celsius degree
13 CT Secondary burden:
Range: 0~160ohm (automatically change range in 2ohm/20ohm/80ohm/160ohm)
Error: <0.2%RDG+0.02%FS
Maximum resolution: 0.001ohm
14 PT Secondary burden:
Range: 0~80kohm (automatically change range in 800ohm/8kohm/80kohm)
Error :<0.2%RDG+0.02%FS
Maximum resolution: 0.1ohm
15 PT ratio measurement:
Range: 1~35000
1~10000 error<0.1%
10000~35000 error<0.2%
16 PT ratio error measurement: Typical error <0.05%, Maximum Error<0.1%
17 PT phase angle measurement: maximum error < 3min
18 Make evaluation for test results according to selected standards
19 Make word report for test result
20 Make word reports one time for multi-group test records on the PC
21 Calculate the ratio errors and phase angle errors at rated burden and working burden in one time test
22 Compare excitation curves with saved excitation curves in the same window
23 Memory capacity: >1000 groups test results
24 Working condition: temperature: -10℃~50℃; moist: ≤90%

  • Country: China (Mainland)
  • Business Type:
  • Market:
  • Founded Year:2009
  • Address:重庆市南岸区南坪金台大厦9-10
  • Contact:Daisy Tao
*Your name:
*Your Email:
*To:重庆格纳迪机电设备有限公司
*Subject:
*Message:
Enter between 20 to 3,000 characters. English only.     Characters : 0 / 3000
*Enter the secure code shown below Mfrbee security Image      Reload Image

submiting now We do inquire for you , please wait ...

Split Core Current Transformer
Split Core Current Transformer

Split Core Current Transformer The appearance is nice and the installation and wiring are convenient. AKH-0.66/K-Φ series split type ct transformers are mainly used in reconstructing projects of urban and rural power grids. Product has the advantages of small size, high ...

Acrel Co.,Ltd.

Current transformer clamp for large current
Current transformer clamp for large current

The model Q150 current transformer clamp can be used in large current situation and cooperate to cable fault tester and cable identification device, used for cable test work. It can even measure up to 3000A AC large current and output 0-5A AC current for other measuring or ...

gfuvegroup

ACREL AKH-0.66 / K SPLIT CORE CURRENT TRANSFORMER
ACREL AKH-0.66 / K SPLIT CORE CURRENT TRANSFORMER

Acrel AKH-0.66/K series current transformer split core are mainly used in reconstructing projects of urban and rural power grids. The split core current sensors can be mounted easily without the removal of the primary bus. They also can be operated with electricity, which ...

Jiangsu Acrel Electrical Manufacturing Co., LTD.1