1- 150,000/hr. Keller boiler 150# design, Detroit Stoker with auxiliaries, accessories, fuel and ash handling equipment. The boiler was used for less than 30 days and has less than 300 hours of operation on it. Buyer must dismantle from the enclosed building space Boiler has been inspected and revealed no condition that would cause concern about the mechanical conditiion of the boiler.
1-150, 000 / HR. Keller boiler 150# design, Detroit Stoker with auxiliaries, accessories, fuel and ash handling equipment.
Payment Terms: | L/C |
Pressure: | Low Pressure |
Structure: | Water Tube |
Usage: | Industrial |
Output: | Steam |
Fuel: | Coal-fired |
Model Number: | MK-150 |
Brand Name: | Keeler |
Place of Origin: | United States |