Federal manages the engineering, procurement and project management aspects, while the fabrication, inspection, and testing works are executed in our associate yards in Indonesia, India, Thailand & China. This maximizes our group resources and gives us a competitive edge in the international arena.
The work scope includes conceptual engineering, detail engineering, procurement, fabrication, project management and transportation, depending on the complexity and requirements of the system. Field installation & commissioning works are also provided on an optional basis depending on the clients' requirements and location of project. All these equipment & systems are engineered to international codes of practice.
As part of our expansion of services to the oil & gas, power and industrial projects, Federal had acquired the capability to handle the following custom-made process equipment & systems comprising of mechanical, structural, electrical & instrumentation works.
As part of our expansion of services to the oil & gas, power and industrial projects |
Model Output capacity (KW) Gas Consumption (Nm3/h) OilConsumption (kg/h) Specifications of Thermal Oil Furnace Burner (Mcal) EP1GQ/GNQ 720 72 / 50 EP2GQ/GNQ 1420 142 120 75 or 100 EP3GQ/GNQ 2380 238 200 125 or 150 EP4GQ/GNQ 3315 332 280 200 or 250 EP5GQ/GNQ 5440 544 458 350 ...
Come From Ebico (China) Environment Co., Ltd.
Model Output capacity (KW) Gas Consumption (Nm3/h) OilConsumption (kg/h) Specifications of Thermal Oil Furnace Burner (Mcal) EP1GQ/GNQ 720 72 / 50 EP2GQ/GNQ 1420 142 120 75 or 100 EP3GQ/GNQ 2380 238 200 125 or 150 EP4GQ/GNQ 3315 332 280 200 or 250 EP5GQ/GNQ 5440 544 458 350 ...
Come From Ebico (China) Environment Co., Ltd.
Model Output capacity (KW) Gas Consumption (Nm3/h) OilConsumption (kg/h) Specifications of Thermal Oil Furnace Burner (Mcal) EP1GQ/GNQ 720 72 / 50 EP2GQ/GNQ 1420 142 120 75 or 100 EP3GQ/GNQ 2380 238 200 125 or 150 EP4GQ/GNQ 3315 332 280 200 or 250 EP5GQ/GNQ 5440 544 458 350 ...
Come From Ebico (China) Environment Co., Ltd.