Gas Boiler (Output: Hot Water)

With small size, light weight, little land cover, convenient transport, installation and servicing.

With 30 models, modularized assemblage, adaptable to various demands;

With full hose arrangement, limited water capacity, manufactured by the national standard, safer operation;

With fin-tube heat exchanger, efficient and energy-saving;

With silent fan, smoothing out noise;

With 24V working voltage, safe and electrically economical;

With American Honeywell electromagnetic automatic control system, realizing the automatic operation easily;

With atmospheric combustion, accessible directly to low-pressure gas supply net, quite adaptable to gas resources;

Eight Virtues of the Modularized Atmospheric Boiler

Compared to the boiler, if a large-sized single boiler is adopted for a building, disintegration is unavoidable. And there will be many components such as driver-over adapter, draw rod, controller, nut, bolt etc. As to the boiler, it is not supposed to miss any component or engage complicated procedures

As all the installation of  Boiler is done in the factory, the demand for on-site installation workers is limited.

The  boiler device is not critical of locations. It can be installed everywhere, even on the roof. Nor dose this device call for any particular damping materials.

To a new building, it is neither necessary to plan for the early installation nor necessary to pay for anything before the use of the boiler.

The assembly, default and determination are all accomplished in the factory.

Since the time of peak charge accounts for less than 20% of the heat-required days, waste may occur in the rest of the time due to excess productive capacity. The Boiler has succeeded to realize the tight inosculation of output and demand, putting an end to the waste caused by large-sized boilers.

The boiler selected should be capable enough to cater for the 100% charge appeared in winter.

The System has resolved the tickler of too-capable.

The supply for units like schools and hospitals should exceed the heating requirements in case there is break of heating supply. The Modularized Atmospheric Boiler itself is characterized in surplus design. Should there be any problems with a single module, the rest modules will run uninterruptedly. Thus major charge is secured even if not all.

Stand-by

realizes a whole-year efficient operation with the modularized initiation of just sufficient modules. The boiler is able to be initiated one module a time as required and a next module as the previous one has been fully charged.

Modularized initiation is more economical with gas than that of a single large-sized boiler.

Modularized Initiation

Features of the Modularized Atmospheric Boiler

Gas Boiler

Gas Boiler
Product Profile

  • Type:Once Through
  • Style:Horizontal
  • Pressure:No pressure
  • Structure:Water Tube
  • Usage: Hotel / Apartment / Office Buiding / Sch...
  • Output:Hot Water
  • Fuel:Gas-fired
  • Place of Origin:Zhejiang China (Mainland)
  • Country:China (Mainland)
  • telephone:86-571-88391791,88391691, 88391692,88391693
Delivery Time: 45 days after the receipt of deposit
Supply Ability: 90 Unit/Units per Month
Payment Terms: L/C,T/T
Port: Shanghai / Ningbo
Type: Once Through
Style: Horizontal
Pressure: No pressure
Structure: Water Tube
Usage: Hotel / Apartment / Office Buiding / School
Output: Hot Water
Fuel: Gas-fired
Place of Origin: Zhejiang China (Mainland)
*Your name:
*Your Email:
*To:Zhejiang Orient Group Light Industrial Products Imp. & Exp. Co., Ltd.
*Subject:
*Message:
Enter between 20 to 3,000 characters. English only.     Characters Remaining: 0 / 3000
*Enter the secure code shown below Mfrbee security Image      Reload Image

We do inquire for you , please wait ...

Gas & Water Assisted Injection Mold

Water & Gas Injection Mold Since the thermal conductivity and heat capacity of water are much bigger than nitrogen, so the injection cycle of water-assisted is about 70% shorter than the injection cycle of gas injection moulding; The product wall thickness of water-assisted ...

Come From Unique Solutions Mold

EBICO EC-GR Ultra Low NOx Hot Water Boiler Burner

Model Output capacity (KW) Gas consumption (Nm3/h) Specifications of boiler (T) EC1GR 850 85 0.5/1 EC2GR 2000 200 2 EC3GR 3000 300 3 EC4GR 4800 480 4/5 EC5GR 6800 680 8 EC6GR 9500 950 10/12 EC7GR 13000 1300 15 EC8GR 17000 1700 20 EC9GR 20000 2000 25 EC10GR 24500 ...

Come From Ebico (China) Environment Co., Ltd.

High temperature multistage centrifugal boiler water pump

High temperature water pump for steam recovery high temperature and high pressure water pumps, steam high-temperature condensate water recovery pumps, steam recovery pumps, steam recovery pumps, high-temperature and high-pressure water pumps, high-temperature water pumps, The ...

Come From Kenshine Pump And Valve MFG Co.,LTD