|
||||
Latest Research & Development in Palm oil Milling technology has shown that changes in the FFB Sterilisation Process, higher electrical power demand, stringent environmental emission standards and the use of empty bunch fibre (EFB) as fuel require new method in Boiler Evaluation. A shortage of manpower demands more automation in Fuel Feeding, Automatic Boiler Control and Continuous Ash Discharge. |
Boiler Specifications
Design Code : BS 1113 / A.S.M.E Section 10
Type : Bi-Drum
Furnace Design : Refractory Backed / Membrane Wall
Boiler Specifications Design Code : BS 1113 / A.S.M.E Section 10 Type : Bi-Drum |
Model Output capacity (KW) Gas consumption (Nm3/h) Specifications of boiler (T) EC1GR 850 85 0.5/1 EC2GR 2000 200 2 EC3GR 3000 300 3 EC4GR 4800 480 4/5 EC5GR 6800 680 8 EC6GR 9500 950 10/12 EC7GR 13000 1300 15 EC8GR 17000 1700 20 EC9GR 20000 2000 25 EC10GR 24500 ...
Come From Ebico (China) Environment Co., Ltd.
High temperature water pump for steam recovery high temperature and high pressure water pumps, steam high-temperature condensate water recovery pumps, steam recovery pumps, steam recovery pumps, high-temperature and high-pressure water pumps, high-temperature water pumps, The ...
Come From Kenshine Pump And Valve MFG Co.,LTD
Model Output capacity (KW) Gas consumption (Nm3/h) Specifications of boiler (T) EC1GR 850 85 0.5/1 EC2GR 2000 200 2 EC3GR 3000 300 3 EC4GR 4800 480 4/5 EC5GR 6800 680 8 EC6GR 9500 950 10/12 EC7GR 13000 1300 15 EC8GR 17000 1700 20 EC9GR 20000 2000 25 EC10GR 24500 ...
Come From Ebico (China) Environment Co., Ltd.