SJ-H TYPE boiler

Since the front part of boiler can be opened completely in its bolt assembly method, it is easy to perform repair/maintenance.
Since this boiler adopts a fully-automatic system by one-touch method from ignition to interruption,
  it is quite convenient for the operator to manage the unit.
According to the boiler capacity, the 2-pass or 3-pass method can be selected and used for the combustion gas.
Since the height of boiler is quite low, this unit can be installed easily in a place where the building is low.
  • Country:South Korea
  • telephone:82-031 499 6747
Since the front part of boiler can be opened completely in its bolt assembly method
*Your name:
*Your Email:
*To:SAMJUNG BOILER IND. CO.,LTD.
*Subject:
*Message:
Enter between 20 to 3,000 characters. English only.     Characters Remaining: 0 / 3000
*Enter the secure code shown below Mfrbee security Image      Reload Image

We do inquire for you , please wait ...