Note: Boiler comes with two burners, one rated at 40,000 Lb/Hr, and the other rated for full capacity at 70,000 Lb/Hr.
This is a complete boiler plant which consists of (1) 70,000 Lb/Hr Nebraska boiler which fires natural gas or #2 fuel oil, (1) 70,000 Lb/Hr Kansas City DA with duplex feed water pumps, blow down
heat recovery system, economizer, breeching, structural steel supports, stairs, catwalks, motor control center, and VFD control on the blower motor. System is available for removal and can be set
on trucks in 2 to 3 weeks.
Natural Gas or Number 2 Fuel Oil / Atomizing Steam
Watertube | |||||||||||||||||
|