Left-right adjustments are contolled by the pad under the mast stand and forward and backward adjustments are controlled by the eccenter at the seat of the A-bracket.
The frame of the derrick is structured in sheets for installation,take-down,and transportation.
Low height installations with integral lift-fall are available for the derrick design,The derrick is divided in two intervals on which plans contact with each other ,fixde connection bipyramid pins of ensure their rigidity join beteen intervals.
Low height installations with integral lift-fall are available for the derrick design.
try for petroleum to get through more products
Supply Ability: | 1 Set/Sets per Month |
Minimum Order Quantity: | 1 Set/Sets |
Brand Name: | xinlong |
Place of Origin: | Shaanxi China (Mainland) |