Photo on the right shows a Professional Engineer testing and certifying the crane.
The result - a happy customer who has his problem solved at a fraction of the cost anticipated.
We studied their problem and came out with a fixed boom crane with a 3-ton winch, a trolley that can move in and out and a hydraulic system that can swivel the boom an angle of 110 degrees.
Obayashi Construction has such a problem when constructing Savu Towers along Shenton Way. They needed a 3-ton crane to pick up formworks from the road side which was 12 metre away. Total building height is 39 storey high.
Call Syntech and we will solve it for you.
What do you do if you need a 3-ton crane for a building and yet have no space for a tower crane?
Fixed Boom Crane