submersible motor cable

Following suspension of plunger engine coil wire for 24 hours in 15 C water, it is subjected to an initial 3 Kv 50 Hz voltage for 10 minutes. Following the high voltage trial,insulation resistance is tested through 100 V c.c.
The voltage test of engines wound with wire successfully passing the high voltage test will be determined through the following formula.
Plastic-Insulated Winding Wires :

Time-dependent behaviour of the specific insulation resistance under an alternating voltage load of 600 V in a water trough at a temperature of 80 C

Electrical Test

  • Place of Origin:Turkey
  • Country:Turkey
  • telephone:90-212-4521901
Place of Origin: Turkey
*Your name:
*Your Email:
*To:BRANDI TEKSTIL VE DIS TICARET LTD STI
*Subject:
*Message:
Enter between 20 to 3,000 characters. English only.     Characters Remaining: 0 / 3000
*Enter the secure code shown below Mfrbee security Image      Reload Image