7.Packing: As common, put every piece in plastic bag,then put them in the carton box, and final put them in the wood cases. Also can packing acoording to the customers's requirement.
6.Pay 30%deposit in advance By T/T before doing the goods, then pay 70% after see the copy of B/L.
5.Pay 50% in advance when do the mould ,after the sample are satisfied ,please pay the balance.
4.The surface just do the oxidation treatment.
3.The process can be investment casting, also can do in sand casting.
2.The material is stainless steel, can be 304, 316 and son on, also can do according to the customer's requirement.
1.This goods called oil pipeline flange, which is used in the called oil.
this oil piplelind flange,use the stainless steel, make from the investment casting
Delivery Time: | Make the mould with sample for 35 days, and 30 days for one batc |
Package: | As common, put every piece in plastic bag,then put them in the carton box, and final put them in the wood cases. Also can packing acoording to the customers's requirement |
Supply Ability: | 3000 Ton per Year |
Minimum Order Quantity: | 0.5 Ton |
Payment Terms: | L/C,T/T |
Port: | NINGBO |
surface treatment: | oxidation treatment |
Place of Origin: | Zhejiang China (Mainland) |
Material: | Stainless Steel |