Size: OD1356XTHK148
Metail: ASTM A182-F304L
The flanges deliver to the Fourth Construction Company of Sinopec.
The special type flange, apply to the high pressure equipment.
The special type flange. for high pressure equipment.
Delivery Time: | 45 Days |
Package: | Plywood Box |
Supply Ability: | 50 Ton per Month |
Minimum Order Quantity: | 1 Piece/Pieces |
Payment Terms: | T/T |
Port: | SHANGHAI |
Brand Name: | LYGM |
Place of Origin: | Jiangsu China (Mainland) |