Review the connection of the mouldings and ensure there is no bonding leak out,then polishing the moulding, in that case ,it will be symmetrical,and slippery, at last spraying the polymer pastern on them.
5,FINISHING
During the construting ,if come into contact with anomalistic empty hole,and slack conduit.
During the bounding you should use the special tools to extrude the mouldings softly , symmetrically,and use the rule , gradienter to check the platness and verticality.,during the bonding you should observe the dose in roder to overflow ,patch should not beyond 1.5MM, After bonding you should adopt hook ,nail ,plank ect special tools to fixup temporarily ,and backout untile it is stable.
4,BONDING ASSISANT
B, paste the PES polystyrene line: the size of the PES polystyrene line is according to customers requirements. If the window frame is squareness ,it can cut 45
eps mold/eps line/eps foam mold
1.safety used,high durability,easy installation
2.exquisite surface,accurate dimension
Delivery Time: | 15-21 days |
Package: | package in bubblepak,and bubblepaks in wooden case or according to your requirement |
Supply Ability: | 1000 Meter per Day |
Minimum Order Quantity: | 1000 Meter |
Payment Terms: | L/C,D/P,T/T,Western Union |
Port: | Shanghai |
Fob Price: | US$2-20Shanghai |
weight: | lightweight |
length: | 1 meter |
size: | 143*109 mm |
color: | gray or any color |
Model Number: | BM-029 |
Brand Name: | Lansheng |
Place of Origin: | Jiangsu, China (Mainland) |
apparent density of eps board: | 18-22 Kg/m3 |