6) Free operator training.
5) The product delivery of the goods.
4) The ordering form and materials application are conducted in strict accordance with ISO9001 quality management system.
3) the client service department provides clients with detailed product introduction and overall quotation serice.
2) The computer composite composite drawing department provides visual graphic and dimentional drawings.
1) The design department provides design plans as client request.
6Type of Runner:hot runner
We can offer the following service:
4) Mould life:1000, 000 times
5) Quality assurance: ISO9001
3) Tooling lead time: 45 days
1) Plastic material: PP
2) Mould run fully automatically
Feature:washing machine mould.
SHENGYI MOULD is a company with more than ten years experiences of making mould.We have a high-level designers team and we adopt advanced machine as CNC\DMG\EDM\CMM.
twin tub washing machine mould
twin tub washing machine mould
1) superior quality
2) competetive price
3) punctual delivery
4) OEM service
Delivery Time: | about 45-60 days. |
Package: | packing by wooden box or as customer's requirement. |
Supply Ability: | 30 Set/Sets per Month |
Minimum Order Quantity: | 1 Set/Sets |
Payment Terms: | L/C,T/T |
Port: | ningbo port |
Runner Type: | Hot Runner |
Certificate: | ISO9001 |
Product: | Household Appliance |
Product Material: | Plastic |
Shaping Mode: | Plastic Injection Mould |
Brand Name: | shengyi mould |
Place of Origin: | Zhejiang China (Mainland) |