If there are any requirements from the Contractors Quality Plan that will help us work more efficiently on site, we will look in to the details of any such suggestion and try to implement them
immediately.
List of Plant & Machinery in the fleet.
We will provide mobile telephone and pager numbers of all personnel relevant to the site In order to attend any site emergencies
We will maintain the draw down of groundwater at - 0.50m below the maximum level of excavation as mentioned in the method statement.
There will be periodic maintenance of all our equipment on site to ensure uninterrupted and efficient working of our system.
- The equipment sent to site will be pre-checked at our premises/workshop and will be tested on site (pump) prior to commencement of our works in full swing.
1 Miller 6" diameter Dewatering Pumps 1 No.