During retrofit the hardware from GTU-10PC is installed on the existing foundation into an existing enclosure with upgrading of gas pumping set systems.The hardware provides for upgrading of gas compressor systems for the GTU-10PC installation, and also, replacement or upgrading of out-of-date or worn-out systems, and it is determined by the specification approved by the Customer.
The GPA-C-6,3 gas pumping unit retrofit is conducted by substituting the NK-12S" engine for the GTU-10PC gas turbine |