P.S: We can supply any products which are fit for casting according to customers' drawings or samples
You inquiries will be welcomed.
11. Mass production: 25 days ~ 30 days below 5 tons, about 45 days above 5 tons
10. Sample circle time: tooling: 7 days ~ 15 days. samples: 7 days ~ 15 days after tooling qualified.
9. Payment of term: TT or L/C
8. MOQ: 150pcs
7. Package: bubble bag + carton + pallet
6. Test: water press test
5. Min. machining tolerance is +/-0.02mm
4. Finish: Casting or machining
2. Material: Steel or Al or Copper or Iron
3. The material is qualified, before each pouring we test the materail with Optical Spectrum Analyzer
1. Process: Investment casting or sand casting
We supply pump parts with high quality & competitive price
pump parts
Material: Steel or Al or Copper or Iron
Finish: casting or machining
Min. Maching tolerance:+/-0.02mm
MOQ: 100pcs
Delivery Time: | within 35 days after receiving your payment or L/C |
Package: | suit for sea transportthe gross weight of each carton is below 25kgsthe gross weight of each pallet is below 1000kgs |
Supply Ability: | 60 Ton per Month |
Minimum Order Quantity: | 100 Piece/Pieces |
Payment Terms: | L/C,T/T |
Finish: | casting or machining |
MOQ: | 100pcs |
Material: | Steel or Al or Copper or Iron |
Pressure: | Low Pressure |
Standard or Nonstandard: | Nonstandard |
Usage: | Water |
Structure: | Piston Pump |
Place of Origin: | Shandong China (Mainland) |