contract: cn200885013 Cici xia
delivery time:10-15 days
port:ningbo or shanghai
price:usd 1-1.5
weight:190g
gas cylinder
zinc alloy material
handwheel brass or iron
gas cylinder
zinc alloy material
handwheel brass or iron
try gas cylinder to get through more products
Delivery Time: | 10 days after recieved the advance payment |
Package: | inner pp bagouter paper carton |
Supply Ability: | 1000000 Piece/Pieces per Week |
Minimum Order Quantity: | 5000 Piece/Pieces |
Payment Terms: | L/C,D/P,T/T |
Port: | ningbo or shanghai |
Fob Price: | US$1-1.5ningbo or shanghai |
Port Size: | 10mm |
Media: | Gas |
Temperature of Media: | Normal Temperature |
Material: | Alloy |
Power: | Hydraulic |
Pressure: | Low Pressure |
Structure: | Pressure Reducing |
Standard or Nonstandard: | Standard |