Delivery time(days): 35 days
Body Size W*D*H(mm) 230*305*728
Net Weight/Gross Weight(kg): 7.0/8.0
Loading Quantity (20'/40'GP/40'HQ)pcs: 378*800*950
Description :
1.Remote control and Panel Control
2.Washable filtration system
3.Germ-free water curtain for extra cooling
4.Larger anti-bacterial water tank
5.Hi-tech PTC heating element PTC assures a safe and rapid heating
6.with 2 power options (1000w/2000w)
7.Two choices of air flow directions
8.Three selections of fan speed
9.Easy to operate
10.Very convenient to move around with casters
11.Up to 7.5 hours timer
12.CE/GS/ROHS
Specification:
Standard Color: Grey white
Water tank capacity: 5Liter
Power suppler: 220v-240v/50HZ
Power (cooling): 70w
Airflow volume: 480m3/h
Anion Amount; 2*106n/cm3
Package size: W*D*H(mm): 290*345*740
378/800/950
(20/40GP/40HQ)pcs
LOADING QUANTITY
35days(for 800pcs)
Delivery Time
290*345*740mm
Package Size
T/TL/C
Payment Terms
220V-240V~50Hz
Power suppler
China
Product Origin
800pcs
MOQ(1*40GP)
CE/GS/ROHS
Approvals
TSA-1010BH
Model No.
Product Description
1. Air cooler/heater/fan/humidifier/purifier.
2. CE/ GS/RoHS approved.
3. MOQ:800 pcs.
Payment Terms: | L/C,T/T |
Port: | Ningbo |
MOQ: | 800pcs |
Place of Origin: | Zhejiang China (Mainland) |
Model Number: | TSA-1010BH |
Certification: | CE, EMC, GS, RoHS |
Cooling/Heating: | Cooling/Heating |
Type: | Portable |
Power Source: | Electrical |
Use: | Room |
DL-3 electric air heater is consists of 7 parts: electric heater + insulation box + fan + fresh air damper + waste heat recovery device + dehumidification fan + control system. It is specially designed for supporting downflow drying room/heating rooms. After convert electrical ...
DL-2 electric air heater is consists with 6 parts: electric heater + inner tank + insulation box + fan +fresh air damper + control system. It is specially designed to support the left and right circulation drying room. For example, the 100,000 kcal model drying room, it is ...
DL-1 electric air heater is consists of 4 parts: stainless steel electric heating finned tubes + insulation box + fan + control system. The electric heating groups start sequentially to convert electrical energy into heart. And heating the fresh air entering the box at a ...