Central air conditioner

5.There is a valve out of iinlet and outlet tube of heat exchanger to adjust water flow or cut off cooling and heating supply in the course of inspection and installation.

4.The inlet and outlet joint of heat exchanger should follow this way:down inlet,up-outlet,that can ensure the refrigerant and air flow a converse way.

3.The drainage and exhaust valve should not be damaged in the course of installtion.When the unit start up,the air should be exhausted.

2.The drainage hose condensed water should be connected with"U"type seal and down to sewer so that the water can flow sout swimming.

1.The unit should be installed in balance so that the fan can run smooth.

High EER. Economic type.

  • Place of Origin:Anhui China (Mainland)
  • Brand Name:YAIR
  • Model Number:BFPD6
  • Voltage (V):380
  • Power (W):50000
  • Capacity (btu):180000
  • Certification:CB, CE, EMC, EMF, GS, RoHS, SASO
  • Cooling/Heating:Cooling/Heating
  • Type:Central Air Conditioners
  • Power Type:380V50HZ
  • Power Source:Electrical
  • Use:shopping.hotel
  • Country:China (Mainland)
  • telephone:86-550-3161197
Delivery Time: 30days
Package: By wood
Supply Ability: 1000000 Ton per Year
Minimum Order Quantity: 5 Set/Sets
Payment Terms: L/C,T/T
Port: Nanjing
Fob Price: US$4500-4800Nanjing
Power (W): 50000
Capacity (btu): 180000
Certification: CB, CE, EMC, EMF, GS, RoHS, SASO
Cooling/Heating: Cooling/Heating
Type: Central Air Conditioners
Power Type: 380V50HZ
Power Source: Electrical
Use: shopping.hotel
*Your name:
*Your Email:
*To:China Yangzi Group Chuzhou Yangzi Air Conditioner Co., Ltd.
*Subject:
*Message:
Enter between 20 to 3,000 characters. English only.     Characters Remaining: 0 / 3000
*Enter the secure code shown below Mfrbee security Image      Reload Image

We do inquire for you , please wait ...