Plant shelf
Surface treatment:chrome or nickle plaing
good welding,
no burr and pass 24hours' salt spray test..
Delivery Time: | 30days |
Package: | Each piece of plant shelf) packaged by PE paper, and the carton added wood pallet. |
Supply Ability: | 20000 Piece/Pieces per Day |
Minimum Order Quantity: | 10000 Piece/Pieces |
Payment Terms: | T/T |
Port: | Shanghai |
Fob Price: | US$1.8-2.1Shanghai |
Model Number: | wx-hj-04 |
Place of Origin: | Jiangsu China (Mainland) |
Material: | Metal |
Type: | Storage Holders & Racks |
Brief Introduction • Size: 22\"x53\"x77\" ; 22\"x57\"x77\" ; 22\"x59\"x77\" or 46x44x77\'\', 44x31x77\'\' or custom design is welcomed • Material: solid steel • Caster: 2\"x5\" or optional • The shelf can be equipped with steel shelf, wood shelf or wire mesh deck. ...
Come From Sinoracking
Designed with heart, just to break the ordinary, become different. --Large storage space, baking lacquer process, high-quality panels, stable and solid, reasonable use of space. --Applicable scenes: conference room, office, living room, bedroom. --Custom made to order from ...
Come From Sinoracking
EDI PLANT WATER TREATMENT EDI plant water treatment module is usually placed behind the reverse osmosis system, which not only overcomes the lack of deep desalination of reverse osmosis effluent, but also further removes trace carbon dioxide, residual salt, silicon dioxide, ...