- Removing of old paneling and refitting back at the same place with using new metal screw.
- Ship side wall and cealing doing the new rock wool insulation fixing in the nails and locking.
- Same side wall insulation covering the fibre glass cloth sizely cutting and fixing.
Insulation covering with 22GG G.I.sheet sizely cutting and fixing with new screws.