(7) Packing: In cartons then to a pallet or according to customer's request
We also produce according to customer's design, detailed drawing and size is warmly welcome.
(6) Delivery Time: Within 30 days each 20ft container after receiving the advance deposit.
(5) Payment Term: 30% advance deposit, the balance T/T by copy of B/L.
(4) Loading Port: FOB Tianjin,China.
We also produce according to customer's design, detailed drawing and size is warmly welcome.
(3) Specification:
(2) Finish: Electro Galvanized; Hot-Dip Galvanized is also availiable
(1) Material: Iron Plate Q235
U Form Pole Anchor, Electro Galvanized
Delivery Time: | Within 30 days each 20ft after receiving the advance deposit |
Package: | In cartons then to a pallet or according to customer's design. |
Supply Ability: | 1500 Metric Ton per Month |
Minimum Order Quantity: | one 20ft container |
Payment Terms: | T/T |
Port: | Tianjin,China |
Material: | Q235 |
Finish: | Electro Galvanized |
Material: | Steel |
Type: | Pole Anchor |
Brand Name: | GaoYun |
Place of Origin: | Hebei China (Mainland) |