We also produce according to customer's design, detailed drawing and size is warmly welcome.
7) Delivery Time: Within 30 days each 20ft container after receiving the advance deposit.
6) Payment Term: 30% advance deposit, the balance T/T aggainst copy of B/L.
5) Loading Port: FOB Tianjin,China.
4) Packing: In cartons then to a pallet or according to customer's request
2.0mm
75mm
2.0mm
101mm
2.0mm
75mm
2.0/3.0mm
75mm
150mm
Plate Thickness
Width
Full Length 3) Size: Hot-Dip Galvanized and Electro galvanized also available 2) Finish: Red Painted; 1) Material: Iron Q235 |
Adjustable Pole Ground Plate (bolt down post shoe) finished in red painted. Convenient, durable and adjustable
Delivery Time: | Within 30 days each 20ft after receiving the advance deposit |
Package: | In cartons then to a pallet or according to customer's request |
Supply Ability: | 3500 Metric Ton per Month |
Minimum Order Quantity: | 15 Metric Ton one 20ft container |
Payment Terms: | T/T |
Port: | Tianjin,China |
Material: | Q235 |
Finish: | Red Painted |
Length: | 150mm |
Material: | Steel |
Type: | Pole Anchor |
Brand Name: | GaoYun |
Place of Origin: | Hebei China (Mainland) |