6) Delivery Time: About 30 days per 20ft contianer after receiving the advance deposit.
5) Payment Term: Prefer 30% advance deposit, the balance T/T by copy of B/L.
4) Loading Port: FOB Tianjin,China.
3) Packing: On pallet or in carton or according to customer's request
2) Finish: Electro Galvanized OR Hot-Dip Galvanized
4.25
141mm
HF 06
4.175
121mm
HF 05
4.10
101mm
HF 04
3.95
91mm
HF 03
3.90
81mm
HF 02
3.85
6mm
600mm
60mm
71mm
HF 01
Full Length
B
A
Kg/pc
Thickness of plate
Size/mm
Art No.
1) Size:
H-Form Pole Anchor Finished in Electro Galvanized OR Hot- Dip Galvanized
Used with Screws or Nail together
Delivery Time: | About 30 days/20ft after receiving the advance deposit |
Package: | On Pallet or In Carton or according to customer's request |
Supply Ability: | 1500 Metric Ton per Month |
Minimum Order Quantity: | one 20ft container |
Payment Terms: | T/T |
Port: | Tianjin,China |
Finish: | Hot-Dip Galvanzied |
Length: | 600mm |
Material: | Steel |
Type: | Pole Anchor |
Brand Name: | GaoYun |
Place of Origin: | Hebei China (Mainland) |
Shaft material: Seamless high tensile pipe, conforms to ASTM A500 GRADE B Helices material: ASTM A36 Hot rolled plate Corrosion protection conform to ASTM A153 standard for hot dipped zinc coating Leading edge of Helices beveled 45 degrees Greater Section Modulus Strength to ...
Come From Better Screw
Available in 2\", 2.5\", 3\" or 4\" square tube helices thickness are available in 3/8” and 1/2” inch Helices material conforms to ASTM A36 hot rolled plate All helix leading edges sharpened and rock cut and 45 degrees. Corrosion protection to conform to ASTM A153 standard ...
Come From Better Screw
Our light pole foundation anchors are a quick and reliable foundation method for at grade and above grade applications to support street, site and parking light poles. The light pole support anchor systems are installed with hydraulic rotary equipment that turn the foundation in ...
Come From Better Screw