7.Packing: As common, every one put in the plastic bag, then put them into the carton, finally put them in wood case, which is make from three-ply wood,this kind of material can not do the suffocating. And we also can packing acccording to the customer's requirement.
6.Pay 30% deposit in advance by T/T, and then pay 70% after see the copy of B/L.
5.Pay the 50%mould price in advance before doing the mould,and when the samples are satisfied ,please pay the balance.
4.It is not standard ,unregular shape, we can do many kinds if customer provide the drawing or sample.
3.It take the investment casting, then do the finish machining.
2.The material just is carbon steel, like AISI 1045.
1.The goods calls bracket, which used on the construction machinery parts, also can use on mining project.
This bracket is make from the carbon steel, use the investment casting process and do the finish machining
Delivery Time: | 35 days to make the mould and sample, and 30 days for one batch |
Package: | As common, every one put in the plastic bag, then put them into the carton, finally put them in wood case, which is make from three-ply wood,this kind of material can not do the suffocating. And we also can packing acccording to the customer's requirement. |
Supply Ability: | 2600 Ton per Year |
Minimum Order Quantity: | 500 Piece/Pieces |
Payment Terms: | L/C,T/T |
Port: | NINGBO |
surface treatment: | electrophoresis |
Standard or Nonstandard: | Nonstandard |
Structure: | unregular |
Material: | carbon steel |
Usage: | Construction |
Place of Origin: | Zhejiang China (Mainland) |