Single-side bracket

                            after-sales support

                            product manufacture

what can we do  ? product and design

From the above compare we can know that cost saved is about RMB 601700.00, as well as the space for piling up materials is enlarged and the constructing time is shortened.

612200.00

Total amount:

162000.00

3600(per man*day

45RMB/(per man*day)

Manual work

5

12600.00

5400pcs

3.50RMB/pc

Anchor and bolts

4

120000.00

1500(pc*day)

8RMB(pc*day)

Bracket H=1600

3

Steel formwork

120000.00

1500(pc*day)

8RMB(pc*day)

Bracket H=3600

2

Steel formwork

197600.00

520M2

380RMB/M2

One formwork

1

Remarks

Total price(RMB)

Quantity

Unit priceRMB

Items

No.

Using Single-side formwork:

1213900.00

Total amount:

324000.00

7200(per man*day

45RMB/(per man*day)

Manual work

6

174700.00

8320 M2

21RMB/ M2

Wall-through bolts

5

40000.00

1000000M

0.04RMB(M*day)

Inside operation platform and Pipe support

4

180000.00

4500000M

0.04RMB(M*day)

Outside Scaffolding and Pipe support

3

Steel formwork

395200.00

1040 M2

380RMB/M2

Two formworks

2

100000.00

10000 M3

10RMB/M3

Earthwork used up and backfilled

1

Remarks

Total price(RMB)

Quantity

Unit priceRMB

Items

No.

Using double-side formwork:

Take one project for example: In this project, four floors underground, 5.2 m per floor, extended outside wall, using stakes to protect slopes, completed in 120 days. Now lets make a cost analysis between using double-side formwork and single-side formwork:

2.3Economic compare:

With a fast constructing speed, much time is saved.

Waterproof wall-through bolts are saved (while using double formwork in the basement, the waterproof wall-through bolts are one-off and cannot be used repeatedly).

One side of wall formwork and the outside scaffolding are saved.

Inconvenience of construction will never occur, even working space is not enough.

Much earthwork working is saved.

The constructing site is much smaller.

Using the Single-side Wall Formwork can highly reduce the difficulty of the slope-protection.

2.2Economic advantages

  

Material save and civilized construction make the Single-side Bracket environmentally protective.

Wall-through bolt is not used here and the waterproofness is reinforced.

There is no necessary to set so many operating platforms.

Simple constructing operation can make the quality control much easier.

2.1Technical advantages:

2Advantages

On the base of certain operating space, the Single-side Bracket can be used in any single-side wall formwork up to 7.5m, including outside wall of basement, the sewage dealing factory, slopes of the roads and bridges and so on. Usually, an operating space of 4m wide is needed for the highest Single-side Bracket.

 1.Single-side bracket characteristic

 

  • Country:China (Mainland)
  • telephone:86-10-69408442
The Single-side bracket is composed by two parts: anchor system and body bracket.
*Your name:
*Your Email:
*To:Beijing Zulin Formwork & Scaffolding Co., Ltd.
*Subject:
*Message:
Enter between 20 to 3,000 characters. English only.     Characters Remaining: 0 / 3000
*Enter the secure code shown below Mfrbee security Image      Reload Image

We do inquire for you , please wait ...