Frame Hardware the back of frame, lock on the back of frame. and hold the frame
Frame Hardware e back of frame, lock on the back of frame. and hold the frame
Delivery Time: | 7-15 Days |
Package: | Pvc Bag |
Minimum Order Quantity: | 20000 Piece/Pieces |
Payment Terms: | T/T,Cash |
Port: | Ningbo |
Material: | Iron |
Brand Name: | SL Frame Hareware |
Model Number: | H-013-014-015 |
Place of Origin: | Zhejiang, China (Mainland) |