8.Delivery time:Within 25 days after receiving the advance deposit.
7.Payment term prefer:30% advance deposit,the balance TT by copy of B/L.Letter of credit is also ok.
1.Material: made of high-quality low-carbon-steel
2.Finish: wide head and ringed shank
3.Specifications: 3/4"--2"
4. For anchoring house wrap, sheathing, and felt
5.Wide head and ringed shank for greater holding power
6.Packing: Bulk, box, bag, or according to customers' requests
cap nails
cap nails
Model: 3/4"-2";
Colors-on-demand;Ring Shank
try plastic cap to get through more products
Delivery Time: | 25days |
Package: | in carton or in barrel,then in pallet |
Supply Ability: | 3000 Ton per Month |
Minimum Order Quantity: | 3 Ton |
Payment Terms: | L/C,D/P,T/T |
Material: | Iron |
Type: | Cap Nail |
Model Number: | various |
Place of Origin: | Shandong China (Mainland) |