Delivery time: 10days after receiving the advance or L/C at sight.
Production capacity: 300 tons/month
5kgs/box, with humidity resistant plastic bag inside, binding with PVC belt, 200boxes/pallet
4. Pallet packing:
3, 25-50kgs/bag
25--30kgs/carton, with humidity resistant plastic bag inside, binding with PVC belt.
2. Bulk packing:
1. Main: 1 kg per box, 20 boxes per carton
Packing:
Surface: galvanized, diamond point or round point, straight, lined grooved or smooth shank
Diameter: BWG14----BWG5 (2.1mm-----5.6mm)
Length: 1/2''----6'' (12.7mm-----152.4mm)
Material: #45 (ATSM1045)
concrete nail
Delivery Time: | 10 days after receiving the advance or LC at sight |
Package: | Packing:1. Main: 1 kg per box, 20 boxes per carton2. Bulk packing: 25--30kgs/carton, with humidity resistant plastic bag inside, binding with PVC belt.3, 25-50kgs/bag4. Pallet packing: 5kgs/box, with humidity resistant plastic bag inside, binding with PVC belt, 200boxes/pallet |
Supply Ability: | 300 Ton per Month |
Minimum Order Quantity: | 1 Ton |
Payment Terms: | L/C,T/T,Western Union |
Port: | Shang hai, ning bo |
Fob Price: | US$900-1000Shang hai, ning bo |