Q345 Fluid Pipe
Material: A53-A, A135-A, A106-A, B, A179-C, A214-C, A192, A226, A315-B, A53-B
Delivery Time: | within 10 days |
Package: | as per your requirements |
Supply Ability: | 3000 Ton per Week |
Minimum Order Quantity: | 1 Ton |
Payment Terms: | L/C,Western Union |
Port: | Tianjin Port |
Fob Price: | US$300-600Tianjin Port |
Secondary Or Not: | Non-secondary |
Alloy Or Not: | Non-alloy |
Application: | Boiler Pipe |
Place of Origin: | Tianjin China (Mainland) |
Thickness: | 1.5-36mm |
Outer Diameter: | 10-530mm |
Grade: | Q195, Q235, Q215, Q345, 20, 12CrMo, 15CrMo, 20G |
Standard: | BS, GB, ASME, ANSI |