issue the evaluation report to the customers.
-1996 Quality Inspection standard, or do the quality inspection evaluation according to the customer's requirements, and
At the delivery and shipment stage, we will do the Pre-shipment Quality Evaluation per the special Class S-4, ANSI/ASQC Z1.4
ISO9001:2008 Quality Control System standard.
At the production stage, we will provide the service of order production management and quality control for the customer per
result of material property,measure system analysis, regular lab documents control plan, PSW and samples).
company,and supply the PPAP report to customers (including flow chart of process,FMEA, all dimensiones inspection report,test
autocar department of ASQC(American Society for Quality Control),AIAG,Kreisler motors company and Ford general motors
At the project developing stage, we will do the job according to the PPAP procedure(fourth edition) which is specified by
Service:
customer's requirements.
Packing: We will pack the parts with VCI antirust bag and pack with plywood case. Also we can pack according to the
vehicle bridge casting
Material:steel
We make the parts according to the drawing or sample.And we provide the quality control and order managemnet service.
Delivery Time: | 20-40 days after receiving the official order |
Package: | We will pack the parts with VCI antirust bag and pack with plywood case. Also we can pack according to the customer's requirements. |
Minimum Order Quantity: | 1 Ton |
Payment Terms: | L/C,T/T |
Port: | QingDao or TianJin |
Material: | Steel |
Place of Origin: | Henan China (Mainland) |