materila: carbon steel, alloy steel etc.
delivery condition:forged, forged soften annealing
usage:roller, bearing outer and inner race.
steel forged bar
Dia.300-1000mm
steel forged bar
Dia.300-1000mm
Delivery condition:forged, forged soften annealing
usage:roller, bearing outer and inner race
Delivery Time: | Within 45-60 days after receiving the LC |
Package: | Standard exporting packaging |
Supply Ability: | 2000 Metric Ton per Month |
Minimum Order Quantity: | 50 Metric Ton |
Payment Terms: | L/C,T/T |
Port: | China main port |
Material: | Steel |
Place of Origin: | China (Mainland) |