3) Secondary Operations
As with any steel part a number of secondary operations are available to finish the component. One of the strengths of GTA is the ability to readily provide a wide assortment of secondary
operations such as CNC machining, heat treatment, zinc plating, and many other operations.
2) Sintering
Next step is the sintering operation. Parts are loaded into a sintering furnace at approximately 2050
We manufacture powder metallurgy component, oil-impregnated bearing, structural member, high-precision parts and gear.
Delivery Time: | 30 days after order confirmation |
Package: | Cartons in wooden pallet |
Supply Ability: | 300000 Piece/Pieces per Month |
Minimum Order Quantity: | 100 Piece/Pieces |
Payment Terms: | L/C,D/P,T/T |
Port: | Shanghai |
Fob Price: | US$0.1-25Shanghai |
Bronze: | Yellow |
Iron: | gray |
Material: | Steel |
Model Number: | Sintered bronze |
Brand Name: | GTA |
Place of Origin: | Zhejiang China (Mainland) |