Process including clamping and alignment of web and flange, automatic tack-welding is controlled with PLC. Main machine is driven by A.C.inverter, stable and reliable. Upper press-beam is guided thru left and right four rails, ensuring steady clamping of long time use.
Beam automatic assembling machine.
Delivery Time: | 30 days |
Package: | wooden package |
Supply Ability: | 55 Set/Sets per Month |
Minimum Order Quantity: | 1 Set/Sets |
Payment Terms: | T/T |
Brand Name: | Liang Pin |
Place of Origin: | Jiangsu China (Mainland) |