Note: Production can be according to requirement of customer..
Industrial compucter and specific software
Hydraulic shearer(2)
Four hydrautlic notch and die
One leveler grooving roller machine
1-2 power metal feeding frame(equipped with 2 or 4 coil frames)
Basic Equipment:
Coiler------Rawmaterial Feeder------Leveler Grooving Roller--------Notch and Punch Square-----Cut Feed Metal for TDF------Cut Feeding Metal for Duct
work flow:
Duct Manufacturing Auto Line 2
Duct Manufacturing Auto Line 2
Delivery Time: | 8~30 days. |
Supply Ability: | 3 Set/Sets per Month |
Minimum Order Quantity: | 1 Set/Sets |
Payment Terms: | T/T |
Port: | Huangpu |
Model Number: | HCH 2 |
Brand Name: | GZHCH |
Place of Origin: | Guangdong China (Mainland) |
Auto Duct Production Line 4 It\'s mainly for uncoiling, leveling, beading, punching, locking, bilaterally angle steel or TDF flange forming. Because of its small space requirement and easy to install and operate, people also call it \"small line 5\". Auto Air Duct Fabrication ...