Machine weight: +-900kg
Time to change carton sizes: 10-15min depending on box size
Air consumption: 0.5l / carton
Compressed air: 4-6 bar
Other
Control voltage 24V / DC
16Amp, 3.5 kW for hot glue
32Amp, 12 kW for hot air
380/400V, 3-phase, 50Hz
Electrical requirements
Hot air or hot glue
Seal techniques
Variable to 70 cartons/min depending on carton size, board quality and product inside carton
Output
Special sizes on request
Std max 320 x 350 x 60 mm
Std min 80 x 80 x 25 mm
Carton size range (L x W x H)
Specifications
Driven overhead rollers for closing the long and side flap
Adjustable accelerator belts ensure square cartons
Electro-mechanically controlled timing of infeed
All safety devices according to European standards
Safety covers of transparent perspex
Variable speed inverter drive
Solid machine frame of glass beaded stainless steel
Construction
Spring loaded upper runners for uneven cartons (e.g. IQF)
Carton delivery and take-away conveyors in various designs
Increased corrosion protection
Embossing units
Easy centralised adjustments for L & W & H dimensions of the cartons
Conversion kit for sealer to close both 2 AND 3 flap boxes
Optional features / equipment
LL - Left carton side closed, Left exit
LR - Left carton side closed, Right exit
RR - Right carton side closed, Right exit
RL - Right carton side closed, Left exit
Optional configuration
- Automatic dropping of heaters when belt stops
- Low maintenance & easy operation
- Simple design means
- Solid stainless steel construction
The Carton Closer 220 is designed to seal 2 or 3 flaps (hinging on the cover), to the sides of the formed and filled cartons. Virtually any 3-flap style carton can be sealed. The feeding and line direction are built according to customer requirements.
220 Angled carton closer and sealer
The Carton Closer 220 is designed to seal 2 or 3 flaps (hinging on the cover), to the sides of the formed and filled cartons
The Carton Closer 220 is designed to seal 2 or 3 flaps (hinging on the cover), to the sides of the formed and filled cartons |
Machine weight: +-900kg Time to change carton sizes: 10-15min depending on box size Air consumption: 0.5l / carton Compressed air: 4-6 bar Other Control voltage 24V / DC 16Amp, 3.5 kW for hot glue 32Amp, 12 kW for hot air 380/400V, 3-phase, 50Hz Electrical requirements Hot air ...
Come From Goldmann Engineering C.C.